Every founder who messages us for the first time asks a version of the same question: how do I get a factory to take me seriously when I have no volume yet? The honest answer is that volume is not what opens the door. Clarity does. A brand that arrives with one style, a size chart, a fabric weight and a target date gets a real quotation; a brand that arrives with a Pinterest board and a plan to launch with twelve styles gets an estimate that nobody can produce. This guide walks through the six decisions that turn an idea into a first production run, and the three mistakes that cost first time brands the most money.
Almost every failed first launch we see has the same shape: six styles, four fabrics, three colourways. It feels like a brand, but on a production floor it is six separate factory setups competing for one small budget. Choose the one product your customer will judge you on. For most activewear startups that is the legging, sometimes the legging plus a matching bra from the same fabric.
Two practical benefits follow. First, patterns, markers and lab dips are paid once and reused for every later style in the same fabric family. Second, you learn where your fit actually fails before you scale, which is impossible when six styles take turns giving you different problems. If you want to see how a factory builds a style from sketch to carton, our factory process walkthrough shows the sequence and where the time goes.
The size chart is the single most useful document a new brand can bring. Not a copy of a big brand's published chart, which reflects their fit philosophy and their customer, but your own measurements taken against a garment you already consider correct. Measure the waist, hip and inseam of a legging you would be proud to sell, and note the result in centimetres plus the size label it corresponds to.
From that baseline a factory can grade up and down consistently. Without it, grading becomes guesswork and you receive a size run that is technically correct and commercially useless. Our sizing and size chart guide explains how grading tolerances work, and why a 2 cm difference in the hip can be the difference between a return and a repeat order. If you plan to sell plus sizes, be aware that grading from XS to 5XL is a different engineering problem than simply adding sizes at the top end.
Screens lie about fabric. A photo of a buttery legging cannot tell you whether it is 220 or 280 GSM, whether it is nylon spandex or polyester spandex, or how it will behave after twenty washes. Those three facts determine drape, opacity, recovery, price and the sewing method the factory must use.
As a starting point: a 220 to 240 GSM knit reads as light and breathable, suitable for warm studios and summer collections. A 260 to 280 GSM knit has the denser hand feel most consumers associate with squat proof leggings. Nylon spandex gives a softer hand and better colour depth; polyester spandex costs less and holds up well in prints. Ask for a lab dip and a small fabric swatch before you approve anything, and read the weight in the spec sheet rather than trusting the label in the listing. Our legging fabric guide compares the common constructions side by side.
With a 100 pieces per style minimum, the question is not how large your order should be, but how to split it. Three workable patterns: one style in one colour with a full size run; one style in two colourways sharing a size curve, for example 60 black and 40 in a fashion colour; or two styles at 50 pieces each when both come from the same fabric family. What does not work is mixing styles across different fabrics, because each fabric carries its own approval and dye minimum.
Treat the numbers as a test buy. A first run that answers which size sells and which colour reorders is worth more than a larger run that ties up cash in stock you have not validated. The mechanics of splitting sizes and colours inside the minimum are covered in detail in our 100 pcs private label guide, and the reasoning behind minimums at all is in the MOQ explainer.
New brands budget for the garment and forget the rest. A realistic first order budget has six lines:
We quote FOB from a China port and we do not offer DDP or door to door terms, which means the international leg stays visible and comparable in your own numbers instead of disappearing into a landed price you cannot audit. If a supplier quotes you a single all in door price at this stage, ask what the freight component is; that question alone tells you a lot about the supplier.
Production is the shortest part of the timeline and the part most founders over estimate as fixed. A workable sequence for a first order: specification and brief, one week. Sampling, seven to twelve days plus shipping time to your hands for fitting. Revisions if needed, another round. Bulk production, ten to fifteen days after sample approval and deposit. Freight, one to five weeks depending on mode and destination. Customs clearance, a few days.
Add buffer. A launch date set four weeks out is not a plan, it is a hope. Ten to twelve weeks from first message to goods in hand is a realistic working assumption for a first order, and it shrinks on the second order because patterns and lab dips already exist.
A brief that gets a usable quotation on the first reply contains: reference images or a flat sketch of the style, the category and intended use, fabric composition and weight in GSM, a size chart with measurements, your planned split across sizes and colours, label and packaging requirements, target launch window, and destination country for the freight estimate. Our yoga wear manufacturing page summarises the same list, and you can send the brief through the quote request page or straight to our team on WhatsApp. If you want to see what the finished range looks like before you decide on a style, browse the activewear collection.
One last thing worth saying plainly. A startup with 100 pieces and a clear brief is easier to work with than an established brand with a vague one. The factory has to schedule, cut, sew and inspect either way; what changes is how many questions have to be answered before the first cut. Answer them in writing and you will find the conversation moves much faster than the size of your order suggests it should.
Not for a sample. For bulk production most factories, including us, issue the invoice to a business entity for customs and payment reasons, so it is worth having the entity in place by the time you approve the sample. Ask before you pay a deposit so the paperwork matches your import setup.
One, or two if they share the same fabric. Each additional fabric adds its own approval, dye lot and minimum, which fragments a small budget across setups you cannot amortise yet.
Yes, and it is the normal path. Sampling fee is credited against your first bulk order, so the money is not lost if you proceed. You will need a final size split and label plan before bulk is scheduled.
With us it is 100 pieces per style per colour, split freely across sizes, with two colourways possible on one fabric. Below that, sampling is the right route until demand is proven.
Ten to twelve weeks is a realistic working assumption for a first order including sampling, production and freight. Repeat orders skip sampling and typically run four to six weeks shorter.
Our free Buyer’s Guide walks you through MOQ, sampling, production timelines, fabric selection and QC — everything you need before placing your first order.
Read the Buyer’s Guide →